A school gym frame in six working days: the sequence
Six working days, one crane, and a southern New Hampshire school gym: the shake-out, the pick sequence, and the check values written on the back of a plan.
6 min read

-
Steel over a corridor that stayed open: how the picks were sequenced
A school wing addition picked over a corridor that never closed: the pick radii, the flag line and the hour-by-hour window plan, read off the rigging sheet.
6 min read

-
Stairs and rails for a town library: the measure that decides everything
A finish-metal note from the shop: the field measure, the 42 in guard height, the 4 in sphere, and the one dimension on a library stair that had to be cut twice.